Success Stories

Wastewater, Design-Build, Capacity Analysis
2016 APWA project of the year
Clean Water, Condition Assessment
1,072 valves inspected and assessed
Case Study, Wastewater, Design, Construction Management, Capacity Analysis
2 MG wet-weather storage
Flow Monitoring, Planning, Condition Assessment, Capacity Analysis
<3 SSO per 100 miles achieved
Wastewater, Design-Build, Capacity Analysis
2016 APWA project of the year
Wastewater, Planning, Design, Capacity Analysis
90% pipe with RUL <2 years
Wastewater, Clean Water, Stormwater, Design, Condition Assessment
700+ assets mapped
Clean Water, Condition Assessment
1,072 valves inspected and assessed
Wastewater, Clean Water, Design, Capacity Analysis
4,020 LF water main designed
Wastewater, Design
2,900 LF bypass pumping
Stormwater, GIS, Asset Management
74.2  miles of unrecorded assets discovered

What is your challenge?